IT Strategy

One continuous beam of light crossing five archways with a measurement marker rising at each, ESG metrics captured at five stages of the IT asset lifecycle

Top Sustainability and ESG Metrics to Track Across the IT Asset Lifecycle

Most IT teams are asked for ESG metrics for the first time when an auditor, a customer questionnaire, or a regulator wants a number nobody has ever calculated. This guide sets out what to track across the full IT asset lifecycle — procurement, deployment, operation, utilisation, and disposition — what each metric actually measures, where the data comes from, and which disclosure it feeds. It covers the environmental, social, and governance columns rather than treating ESG as a synonym for carbon, explains why embodied carbon and asset lifespan carry far more leverage than endpoint energy, and is blunt about the widely reported figures that will not survive assurance, including the avoided-emissions credit on your disposition certificate.

Read more
A dark platform whose left half is a field of cracked unlit slabs lying flat and whose right half is the same slabs standing upright, evenly spaced and glowing, joined to a bright channel of light beneath, an unsupported estate becoming a resilient one

From Risk to Resilience: Why Microsoft Surface 5G and Windows 11 Are Essential Post-Windows 10

Windows 10 stopped receiving free security updates on 14 October 2025, and roughly three in ten Windows desktops are still running it. This guide sets out the five endpoint positions available after end of support — paid Extended Security Updates, a standard Windows 11 refresh, a Surface 5G refresh, a Windows 365 Cloud PC, and doing nothing — and the single number that settles each one. It covers what ESU really costs at 61, 122 and 244 US dollars per device across three cumulative years, which Windows 11 protections depend on hardware and cannot be retrofitted at any price, what Surface 5G devices actually exist today and which SKUs carry the cellular option, why a provisioned cellular connection removes an entire attack class rather than detecting it, and how to sequence migration waves so the saving is realised at decommissioning rather than promised at go-live.

Read more
One tall stack of six identical flat slabs on a dark platform with only the topmost slab lit brilliantly and the five beneath it dark, the visible share of IT deployment costs sitting on top of the hidden ones

7 Ways to Reduce IT Deployment Costs in 2026

Gartner’s July 2026 forecast puts worldwide IT spending at $6.37 trillion, up 14.2 percent, while combined DRAM and SSD prices are expected to rise 130 percent by year end and push PC prices roughly 17 percent higher. Hardware got more expensive and budgets did not move, which leaves how many devices you deploy, how long they last, and what each deployment costs in labour, licence and rework. This guide sets out seven ways to reduce IT deployment costs in 2026 in the order they pay back: rationalising the hardware catalogue, buying against a forecast rather than a ticket, retiring imaging for zero-touch provisioning with direct despatch, automating application packaging and readiness testing, extending the refresh cycle on condition rather than calendar, making deployment the licence control point, and stopping the deployment of infrastructure nobody uses. It covers the unit that makes the comparison honest, where the seven ways conflict with each other, what the build-buy-rent decision actually turns on, the costs you should not cut, and the specific circumstances in which each mechanism fails.

Read more
CHAT